Metrosystem.12


What's new in Metrosystem.12

-lowering of satisfaction in district when the requirement is not met is determined by the distance of the affected districts from the city center

-adjustments to the potential of old buildings

-fixed error preventing the fare from being set

-satisfaction of district residents is also determined by the length of lines that stations have in a given district

-fixed subsidies drawing error

-adjusted the method of calculating profits

-fixed not working saving in the case of no saved game in the directory with the executable file exists

-shafts can be built even at the cost of demolishing building

-sanctions for interventions from the surface

-requirements for minimum transfer station depth are also determined by the geological conditions

-fixed the warning about the need to expand the depot

-funds for regulating the water flow checked

-fixed displaying the altitude in case its modification is planned

-fixed the numbering of the proposed station names

-adjusted the display of some notice

-it is not possible to cancel the regulation of the water flow that has been started now

-department stores, marketplaces, planetariums and wharfs added

-more distinct bordering of the previews in case of very low satisfaction of the city government

-transport potentials of some places change over time during turns

-the city is allowed to demolish a wider set of building types during its development

-corrected evaluation of the impact of the satisfaction in individual districts on the satisfaction of the city government

-the percentage of daily station utilization compared to the current average is also displayed in the preview for each station

-the possibility of setting whether requirements or subsidies will be generated, the satisfaction of the city government will be monitored independently of the city districts, project management will be an additional cost, the debt will bear interest

-archaeological discoveries increase the satisfaction of the residents of the affected district and the city government

-a milder effect on the satisfaction of the residents of the district in which construction by excavation is taking place

-significant dissatisfaction in the districts has a negative impact on the satisfaction of the city government now

-corrected several errors in the display of lines on some types of previewed data with some combinations of settings

-a more pronounced effect on increasing satisfaction when opening new section or line

-fixed errors in the city development system

-skipping the game settings phase does not lead to the default settings but to the last used

-when the city structure viewed, districts with above-average total transport potential are specially marked

-fixed errors in saving the game in a situation where the station name is being proposed or the station is being renamed

-when proposing the name of a projected station or when renaming an open station, it is not possible to change the fare now

-adjusted the speed of turns

-information panel with horizontal and vertical scrolling

-colours in the geological data view are less colourful when the view is not zoomed in

-adjusted the generation of cinemas, groves, strongholds, hospitals, and parks

-districts for which the deadline for fulfilling the requirement is approaching are specially marked

-terrain modifications have an impact on public opinion if they involve demolition

-adjusted the colour of the indication of the relative station utilization compared to the current average

-adjusted the public satisfaction in city districts data view

-less strict conditions for depot requirements

-more distinct colours in the city division view

-corrected evaluation of inter-station distances for connecting sections

Files

Metrosystem.zip 418 kB
67 days ago

Get Metrosystem

Leave a comment

Log in with itch.io to leave a comment.