Metrosystem.13




What's new in Metrosystem.13
-significantly reduced CPU usage
-terrain modifications and river flow regulation are only possible in the city area
-if the maximum allowed slope control is not set, then the change in terrain elevation after modification is not checked either
-fixed message display
-more prominent border on the city division
-maximum and minimum zoom of the viewed data to one key
-fixed menu display when loading or saving settings or the game
-archaeological discovery affects public opinion in surrounding neighborhoods as well
-construction for the city can only be carried out in places where geological investigation is not underway
-data on altitude and percentage use of stations are displayed even at less than maximum zoom
-the maximum debt limit can be removed in the game settings
-hydrological situation has a greater influence on the duration and cost of construction
-data on percentage station utilization is also displayed in the division into districts
-it is possibe to set crossovers have an effect on the utilization in given section
-removed randomness when estimating the complexity of the project
-higher costs for shorter bored sections
-showing the route works alternately on both ends of the selected route
-it is possible to set the effect of geological investigation to the building on the surface
-brighter color of arrows indicating below-average or above-average station utilization
-sections with a lack of ventilation shafts are marked
-adjusted evaluation of the influence of the crossovers
-the city can expand the international airport
-adjusted generation of city districts
-two stations required as minimum for the first section can be both transfer stations
-fixed errors when geology is disabled by the settings
-the settings panel does not change size after loading or saving settings
-adjusted the rendering of the end section following the depot
-depth data are colored green for fields with a recently revealed geological situation
-fixed errors in settings
-more prominent marking of fields near an ongoing geological investigation
-requirement deadline takes into account current knowledge of the geological situation in the affected districts
-reduced the distance at which a geological investigation can be carried out in parallel
-adjusted the color of the frames
-on a field with a building that cannot be demolished, the minimum depth achievable with demolition is no longer displayed
Files
Get Metrosystem
Metrosystem
Status | In development |
Author | Systemchaos |
Genre | Simulation |
Tags | 2D, Economy, Indie, Minimalist, Pixel Art, Procedural Generation, Retro, Sandbox, Singleplayer |
Languages | Czech, English |
Accessibility | Subtitles |
More posts
- Metrosystem.1268 days ago
Leave a comment
Log in with itch.io to leave a comment.