What's new in Metrosystem.13

-significantly reduced CPU usage

-terrain modifications and river flow regulation are only possible in the city area

-if the maximum allowed slope control is not set, then the change in terrain elevation after modification is not checked either

-fixed message display

-more prominent border on the city division

-maximum and minimum zoom of the viewed data to one key

-fixed menu display when loading or saving settings or the game

-archaeological discovery affects public opinion in surrounding neighborhoods as well

-construction for the city can only be carried out in places where geological investigation is not underway

-data on altitude and percentage use of stations are displayed even at less than maximum zoom

-the maximum debt limit can be removed in the game settings

-hydrological situation has a greater influence on the duration and cost of construction

-data on percentage station utilization is also displayed in the division into districts

-it is possibe to set crossovers have an effect on the utilization in given section

-removed randomness when estimating the complexity of the project

-higher costs for shorter bored sections

-showing the route works alternately on both ends of the selected route

-it is possible to set the effect of geological investigation to the building on the surface

-brighter color of arrows indicating below-average or above-average station utilization

-sections with a lack of ventilation shafts are marked

-adjusted evaluation of the influence of the crossovers

-the city can expand the international airport

-adjusted generation of city districts

-two stations required as minimum for the first section can be both transfer stations

-fixed errors when geology is disabled by the settings

-the settings panel does not change size after loading or saving settings

-adjusted the rendering of the end section following the depot

-depth data are colored green for fields with a recently revealed geological situation

-fixed errors in settings

-more prominent marking of fields near an ongoing geological investigation

-requirement deadline takes into account current knowledge of the geological situation in the affected districts

-reduced the distance at which a geological investigation can be carried out in parallel

-adjusted the color of the frames

-on a field with a building that cannot be demolished, the minimum depth achievable with demolition is no longer displayed